Hybrid solar inverters are increasingly popular in residential solar setups. They combine the functions of a solar inverter, battery charger, and grid-tie system. A hybrid inverter split phase is common in North American homes. It handles 120/240V AC output. This makes it suitable for standard household electrical systems. Wiring it to your breaker box provides seamless integration with your home’s power grid. This enables backup power during outages or allows excess energy feed-in.

What a Hybrid Inverter Split Phase Is
A hybrid inverter split phase can output 120/240 V AC. It can charge a battery bank and usually connects to the grid at the same time. Inside, electronics generate two “hot” legs, L1 and L2. These legs are 180 degrees out of phase. The neutral conductor is the center point between these two legs. Connecting L1‑neutral or L2‑neutral provides 120 V. Connecting L1‑L2 provides 240 V for large loads like dryers or water heaters.
GRANKIA hybrid inverters have three main AC terminal sets. These include an AC input from the grid or generator. They also have an AC output to backed-up loads, and grounding terminals for safety. Understanding which terminals feed which circuits is essential before you open any breaker box or run any cable.

Planning the System and Safety Rules
Before touching the breaker box, you need a clear system layout. This layout should include the PV array, batteries, solar inverter, and which loads will be backed up. Many installers use a dedicated “critical loads” subpanel. They connect the inverter’s AC output to this subpanel instead of feeding the entire main panel directly. This approach limits overload risks, simplifies wiring, and makes it easier to comply with code requirements for backfeed and transfer.
All work must follow local regulations on disconnects, overcurrent protection, wire sizes, and grounding. In many jurisdictions, the code requires labels inside the panel. It also mandates a visible AC disconnect between the inverter and the service equipment. Incorrect wiring can create dangerous backfeed into the grid. Therefore, a listed transfer switch must be used. A proper hybrid inverter split phase transfer function is also necessary.
Important Safety Precautions
Before starting, prioritize safety to avoid electrocution, fire, or equipment damage:
- Turn off power: Always shut off the main breaker at the panel. Verify with a voltage tester that the lines are de-energized.
- Comply with codes: Follow local electrical codes (e.g., NEC in the US) and obtain necessary permits. Consult a licensed electrician if unsure.
- Use proper PPE: Wear insulated gloves, safety glasses, and non-conductive footwear.
- Understand your system: Ensure the inverter is rated for split-phase (e.g., 240V) and compatible with your breaker box’s amperage and phase configuration.
- Battery and solar considerations: If connecting batteries or solar panels, isolate them first.
Neglecting these can lead to serious hazards. If you’re not experienced, hire a professional.

Tools and Materials Needed
Gather these items before beginning:
- Split-phase hybrid inverter.
- Breaker box with available slots for new breakers (main panel or subpanel).
- Appropriately rated circuit breakers (e.g., double-pole 30-60A breaker for the inverter output).
- Wire: THHN/THWN copper wire in appropriate gauges (e.g., 6-10 AWG for 30-50A circuits, depending on inverter specs). Include ground, neutral, and hot wires (L1 and L2 for split-phase).
- Conduit and fittings: PVC or metal conduit to protect wires.
- Wire strippers, screwdrivers, torque wrench, multimeter, and voltage tester.
- Grounding rod or bus bar if needed for additional grounding.
- Labels for breakers and wires.
Check your split phase inverter’s manual for exact specifications, as wire sizes vary by model and load.
Step-by-Step Wiring Instructions
1. Prepare the Inverter and Breaker Box
- Mount the inverter securely near the breaker box, following manufacturer guidelines for ventilation and clearance.
- Open the breaker box cover and identify available slots for the new breaker. Ensure the panel has space for a double-pole breaker matching the inverter’s output amperage (e.g., 40A for a 5kW inverter).
- If using a subpanel for critical loads (e.g., for backup power), install it first and connect it to the main panel.
2. Connect the AC Input from Grid to Inverter
- The AC input allows the inverter to draw grid power for charging batteries or passthrough.
- Run conduit from the breaker box to the inverter’s AC input terminals.
- Install a double-pole breaker in the panel for the input circuit.
- Wire the hot legs. Connect L1 (black wire) and L2 (red wire) from the breaker to the inverter’s AC input L1 terminal. Then connect to the L2 terminal.
- Connect the neutral (white wire) to the inverter’s neutral terminal and the panel’s neutral bus.
- Ground (green or bare wire): Connect to the inverter’s ground terminal and the panel’s ground bus.
- Torque connections to spec (use a torque wrench to avoid loose wires causing arcs).
3. Connect the AC Output from Inverter to Breaker Box
- This feeds power back to the home or grid.
- Install another double-pole breaker in the panel, often labeled as “inverter” or “solar backfeed.”
- Run conduit to the inverter’s AC output terminals.
- Wire L1 and L2 from the inverter’s output to the breaker’s hot terminals.
- Connect neutral from inverter output to the neutral bus.
- Ground as before.
- For hybrid systems with backup, route critical loads through a subpanel connected to the inverter’s load output.
4. Grounding and Bonding
- Ensure proper grounding: Bond the inverter’s chassis to the panel’s ground bus.
- If the system includes batteries, ground them separately per manual.
- In split-phase setups, verify the neutral-ground bond is only at one point (usually the main panel) to prevent ground loops.
5. Connect Battery and Solar Inputs
- Though not directly to the breaker box, these are part of the hybrid setup.
- Wire DC cables from batteries to the inverter’s battery terminals, using fuses or breakers for protection.
- Connect solar panels via the inverter’s MPPT inputs, ensuring polarity.
6. Test and Commission
- Double-check all connections with a multimeter for continuity and no shorts.
- Restore power gradually: Turn on the grid input breaker first, then monitor the inverter display for errors.

Split‑Phase Connections and Breaker Sizing
To achieve true 120/240 V split phase, you must connect both inverter output legs properly. They should be connected to the two bus bars in the breaker box. In a typical split‑phase subpanel, you connect L1 to one hot bus. L2 is connected to the other hot bus. The neutral is connected to the shared neutral bar. This setup allows both 120 V single‑pole and 240 V double‑pole breakers to work. Heavy 240 V loads, like electric stoves, are moved to the inverter‑fed panel. Well pumps also require this move. This should only be done when the inverter’s continuous and surge ratings are sufficiently high. This ensures safe and reliable operation.
Breaker size must match the inverter’s AC rating. It also needs to match panel bus limits. Additionally, consider the “125 percent” rules for backfed breakers in many codes. For example, a 10 kW 240 V inverter outputs about 42 A. Installers often use a 2‑pole breaker rated 50 A in the subpanel. They also select conductors sized for that current and insulation rating. Always check the hybrid inverter’s manual for maximum recommended breaker size and conductor gauge.
What Safety Precautions are Required for Hybrid Inverter Wiring
Hybrid inverter split phase wiring requires electrical, mechanical, and fire‑safety precautions that protect people, equipment, and the grid.
Personal and Worksite Safety
- De‑energize all circuits before working; open DC and AC disconnects and verify with a meter that lines are not live.
- Wear appropriate PPE, such as insulated gloves, eye protection, and safety footwear with rubber soles. Avoid metal jewelry and use insulated tools.
- Keep the work area dry and stand on insulated flooring in damp locations to reduce shock risk.
DC‑Side Precautions (PV and Battery)
- Cover or disconnect PV arrays before wiring; modules in sunlight produce dangerous DC voltage even when the inverter is off.
- Use PV‑rated copper conductors and ensure correct polarity. Place DC isolators or breakers upstream of the inverter. This setup allows for safe maintenance and emergency shutdown.
- Install batteries in a ventilated area. Follow manufacturer charge/discharge limits. Provide appropriate overcurrent protection and disconnects near the battery bank.
AC‑Side and Grid Safety
- Connect the inverter output through correctly sized breakers and conductors, following local electrical codes and utility requirements.
- Prevent unintentional backfeeding of a dead grid by using inverters with certified anti-islanding. When required, use transfer switches or dedicated backup load panels.
- Provide accessible AC disconnects and clearly label all points where the inverter ties into the electrical system.
Grounding, Bonding, and Standards
- Properly ground the inverter and metal enclosures to the building grounding system to reduce shock and lightning risk.
- Maintain correct neutral‑to‑ground bonding locations as required by code, and keep neutral and ground separated in subpanels when specified.
- Use certified equipment (UL/IEC listed). Follow relevant standards such as IEC 62109 for hybrid inverter split phase safety. Additionally, adhere to IEC 62619/UL 1973 for batteries.
Installation Quality and Environment
- Mount the inverter on a stable, non‑flammable surface, away from combustible materials, moisture, and direct extreme heat.
- Ensure good ventilation for cooling. Keep wiring neatly routed in UV‑resistant conduits or raceways. Secure cables with proper clips to avoid abrasion and overheating.
- Inspect equipment for damage before use. Respect warning labels. Torque all terminals to specified values to avoid loose, overheating connections.
Related Split Phase Hybrid Inverter
Common Issues and Troubleshooting
No power output: Check breakers, wire polarity, and inverter settings. Ensure firmware is updated.
Ground faults: Verify bonding and use a GFCI tester.
Overheating: Improve ventilation or reduce load.
Error codes: Refer to the manual; common ones relate to voltage imbalances in split-phase. If issues persist, consult the manufacturer or an electrician.
Flickering Lights: This may indicate a loose connection; inspect all wiring.
Circuit Breaker Tripping: This could signal overload; verify that the inverter and breaker ratings match.
The Articles You may Like
- How Much Solar Energy for Home Use Do You Need?
- Why Professional Industries Choose AGM VRLA Battery Solution
- Single Phase vs Split Phase Inverter Comparison
- Step-by-Step Breakdown of the Solar Panel Installation Process
- 12V 100AH Deep Cycle Battery Last
- Power inverter – Wikipedia